search archive
browse archive Up

049 - Wittson Hall (Basic Science Building)

Object Type: Folder
In Folder: Campus Photographs


View Gallery

Title
Description
Date

Support structures and elevation construction for amphitheater in Basic Science Building. University Hospital visible in background.

1967-10

South corner of Basic Science Building with construction vehicles parked in front.

1968-09

Early construction of the Basic Science Building. Crane, scaffolding, and foundation visible. Entrance to the North Building and homes in the background.

1967-04

Focused image of construction workers and bulldozer

1967

Ground level view through construction of Basic Science Building. Workers present. Top of North Building visible behind construction site.

1967-09-07

Construction on north corner connector to North Building

1968

Bernard Briggs (left) and James Money inspect the construction progress on the Basic Science Building. University Hospital is visible in the background.

1967-11

Aerial view of lower, below ground levels of Basic Science Building construction. University Hospital and Poynter Hall visible.

1967-06

Bernard Briggs (left) and James Money inspect the construction progress of the Basic Science Building.

1967-12

Construction of upper floors of Basic Science Building. Crane with evergreen tree on top central in image.

1967-12

Distance image of Basic Science Building construction site including crane. Ground level structures just beginning. North Building visible in background.

1967-06

Ground level view of the foundation hole and surrounding space for the Basic Science Building. Shows work trucks, North Building, and housing across the street.

1967-10

Aerial view of excavation for the foundation of the Basic Science Building. South building visible in background. Construction vehicles and workers are present at work site.

1967

Excavation and foundation work for Basic Science Building. North building visible. Construction vehicles and workers present on the site.

1967-02

Preparing ground for the excavation and construction of the Basic Science Building. Caterpilar Traxcavator is clearing debris. University Hospital is visible in the background. Viewed from the northeast.

1967-01-10

Preparing ground for the excavation and construction of the Basic Science Building. Caterpilar Traxcavator uprooting tree. University Hospital is visible in the background. Viewed from the northeast.

1967-01-10

Preparing the ground for excavation for the construction of the Basic Science Building. Caterpillar Traxcavator is uprooting tree with University Hospital visible in the background. Viewed from northeast. Image used in A Half Century of Memories pg. 34.

1967-01-10

Preparing ground for the excavation and construction of the Basic Science Building. Caterpilar Traxcavator moving cut tree limbs and debris. University Hospital and power plant are visible in the background. Viewed from the northeast.

1967-01-10

Construction vehicles and scaffolding present during the end of construction of the Basic Science Building.

1968-04-24

Foundation walls being installed in Basic Science Building. University Hospital viewed in background.

1967-11

Foundation construction beginning in the northwest corner of the Basic Science building. Construction vehicles and workers present.

1967-02

Construction vehicles including cement truck, crane, and bucket loader in the foundation hole for the building. Workmen are installing panels along the side of the hole. University Hospital visible in the background.

1967-02

Focused view of crane and crane driver working on the excavation for the Basic Science Building. Early foundation work visible.

1967

Construction workers climbing and working on exterior foundation wall.

1967

Powered by Preservica
© Copyright 2021 University of Nebraska Medical Center